A chemical that has to work for years underground
Minas is a large old oil field in Riau, on the Indonesian island of Sumatra. It began producing in 1952. Today its wells bring up about 25,000 barrels of oil a day, and about 4 million barrels of water with it. [1]
Officials say about 44% of the oil is still in the rock. [1] For decades the field’s operators have pumped water underground to push oil towards the wells. But water is thin. It finds the easy paths and slips past the oil.
So Pertamina Hulu Rokan (PHR), the state oil company subsidiary that runs the field, now adds three chemicals to the water. An alkali and a soap-like surfactant help loosen the oil. A polymer, a powder that thickens water, makes the water push the loosened oil along instead of slipping past it. [5]
PHR began in one part of the field, Area A, in December 2025, and is preparing Areas B and D. [2] The largest planned project is a polymer flood in Area D. A 2024 list from SKK Migas, the state agency that oversees oil companies, puts its potential at 505 million extra barrels. [7]
Two of the three chemicals have an Indonesian source. The head of SKK Migas said in June 2026 that the third, the polymer, was still imported. [2] Six months earlier he was reported as saying all the chemicals were made in Indonesia. [4] We follow the later, more specific statement.
We found no public record of who supplies Minas. What is public is the channel for polymer floods in Pertamina’s fields. Elnusa Petrofin, a Pertamina subsidiary, signed an exclusive distribution deal with SNF, a French polymer maker, for 2023 to 2026. [3]
One tonne of polymer, from plan to oil
No PHR operating procedure is public. These steps are our reading of press reports and general accounts of polymer flooding. [F]
- PHR’s reservoir engineers design the flood. They divide the area into patterns, small groups of wells where some push water in and others bring oil up. They decide how thick the water must be and how much polymer each pattern needs. SKK Migas approves the plan.
- PHR’s buyers look for a polymer that fits. PHR’s laboratory then tests a supplier’s samples against Minas rock, oil and water, because a wrong polymer can break down or block the rock. A field trial follows. Engineers accept or reject it. A 2023 report on PHR’s chemical tender described three stages: formulation, trial, then long-term supply. [6]
- PHR’s buyers award the supply and order tonnes by date. The maker and its distributor ship the powder to the field. The only Indonesian price we found, from a laboratory study, is US$3.3 a kilo, or about Rp54 million a tonne. [9] [E] PHR’s own price is not public.
- Field crews dissolve the powder and pump the thick water underground, month after month.
- PHR’s engineers watch each pattern’s oil, water and pressure for months. They use what they see to adjust the injection, work out the cost of each extra barrel and plan the next area.
Each step makes sense on its own. Engineers stay with a polymer they have proven, because a bad one could damage a producing well. But a new maker must then pass a long test before it can make an offer.
The problem in one sentence: PHR needs proven polymer, reliably supplied and at a predictable cost, but its group’s known channel runs through one foreign maker, and nobody outside knows how much that dependence costs. No source reports a loss or a delay. The harm is our inference.
The question is timely. The exclusive deal’s term ends this year, and we found no word on renewal. [3] Our earlier investigation on What Could Work asked whether someone should build a polymer plant in Riau. It answered: not on what is public, because PHR’s price, the polymer’s origin and its future buying route are unknown. [10] Here we ask what PHR itself could do differently.
What existing businesses could improve: how much polymer each pattern gets
Today, as best we can tell:
- PHR’s engineers give each pattern a planned amount of polymer before injection starts, based on a computer model of the rock.
- Field crews inject it for months, while oil, water and pressure readings come back slowly.
- Engineers review the readings and may change how much, how fast or how thick. Public reports do not say whether they already do this pattern by pattern.
With Improve, the work in step 3 changes:
- Each month, PHR’s ordinary software gathers each pattern’s readings in one place, so nobody argues over which numbers are right.
- Forecasting software (the AI) estimates how much more oil the next tonne of polymer would bring if the crew continues, uses less, changes the pumping speed or stops. It gives a range, not one number.
- The software ranks the choices and gives its reasons. If the ranges overlap, it says “keep the plan”, or asks for the one well test that could settle the choice.
- An engineer accepts or refuses, inside limits set in the approved plan. Crews carry out the change. Buyers get a new estimate of tonnes to order.
Why this step matters. It decides where the polymer goes. In other countries’ floods, the polymer alone cost about US$1 to US$4 for each extra barrel. [8] If some Minas patterns stop responding early, polymer sent there is money spent on little oil.
Why AI. Oil answers slowly, so waiting for proof means spending the polymer first. Engineers also never see what a pattern would have done under another choice. The forecast starts from PHR’s own model of the rock, and the AI corrects it as each pattern responds. That is hard to do with a fixed rule. It is also hard for AI: with few patterns, it has little to learn from. [A]
What needs no AI. Collecting records, the cost sums, the limits and the approval. The cheapest rival is an engineer’s monthly review: draw each pattern’s oil trend and cut polymer when the next barrel costs too much. The AI must beat that.
| Step | Today | With Improve |
|---|---|---|
| Amount per pattern | Planned ahead Reviewed as readings arrive | Reviewed monthly Follows the next expected barrel |
| Looking ahead | Engineers’ models Local practice not public | AI forecast Four choices, each with a range |
| When unsure | Not documented | Keep the plan Or crews run one telling test |
| Orders | Planned tonnes | Revised tonnes Updated after approved changes |
| Decisions and supply | Unchanged: engineers approve, crews inject, the same supplier delivers | |
PHR would use it. It could cut the polymer used per barrel and make orders easier to predict. Improve cannot create a second supplier or raise the Indonesian share of the polymer. And stopping too early could leave oil behind that is hard to reach later.
What a reinvented business could look like: PHR tests rival polymers before it needs them
Today, the part this replaces:
- PHR’s engineers plan a new area and say which polymer it needs.
- Buyers then look for a source, and the laboratory tests that polymer once, in stages.
- Buyers award the supply. The polymer already proven has a head start, because any rival still has the tests ahead of it.
With Reinvent, PHR would test before it needs to buy, and would buy what the thick water does rather than a named product:
- Engineers write the job description. It says how thick the water must stay, how easily it must enter the rock, and how long it must last underground. Any maker’s polymer may try to meet it.
- Makers send samples at any time. The laboratory hides their names behind codes, so the testers do not favour anyone. New tests start whenever fewer than two independent polymers are proven for a coming area.
- Software prepares the testing. It reads old test records, predicts how each untested polymer would behave, and proposes which test would tell engineers most. Engineers approve each one.
- Technicians run real tests. Laboratory, rock-core and limited field trials stay. Nobody accepts a polymer on a prediction.
- Named engineers give or remove a pass. Each pass covers stated conditions. The engineers narrow or end a pass after a bad delivery or a bad well result.
- Buyers invite every maker with a pass to price dated tonnes for the new area. PHR also keeps a small stock from a second maker, so a late ship does not stop the pumps.
| Step | Today | With Reinvent |
|---|---|---|
| What starts testing | A new need An area is being planned | Too few passes Fewer than two proven polymers |
| What PHR approves | One polymer Tested for the need | A behaviour Any polymer that proves it |
| Who may try | Sources found then | Any maker Samples in advance |
| Choosing the next test | Engineers choose | AI proposes Engineers approve |
| After a pass | Supply begins Later checks not public | Pass maintained New results can end it |
| Physical proof, buying, running patterns | Unchanged: real tests decide, people sign, running patterns keep their polymer | |
Where AI does the work. It does three jobs. It matches test names and units across old records, and the owners of those records confirm. It predicts an untested polymer’s behaviour, with a range. [B] And its predictions feed a ranking of which test to run next; unfamiliar polymers go straight to full testing. [C] [D] A simple lookup table may miss how salt, heat, rock and polymer act together. Whether AI does better is the test.
What needs no AI. The open door, the job description, the real tests, the passes and the buying rule. A spreadsheet could run most of this, and would probably bring most of the extra offers. AI would let PHR try more polymers in the same laboratory time.
Why it is more than faster testing. Faster tests inside today’s process would still begin when a need appears. To have two proven polymers before buyers ask for prices, PHR must change three things. It starts testing when proven polymers run short, not when a need appears. It approves a behaviour, not a product. And it makes someone responsible for keeping each pass up to date. If SKK Migas or the buying rules insist on a named product, PHR would gain only the faster tests.
Its limits. The bench cannot make a second good polymer exist. Makers might not send samples without a promise of sales. If PHR splits its orders, each maker sells less and may charge more. SNF could also answer by cutting its price or by producing locally. The bench also differs from the polymer plant our earlier investigation examined. [10] It makes nothing. But it could give such a plant a fair chance to prove its polymer to PHR.
What each change could offer
The table judges each change’s potential if it were built and run sensibly; neither has been tried at Minas.
Favourable for the business Mixed Unfavourable
| Potential | Improve: pattern-by-pattern polymer advice | Reinvent: always-open test bench |
|---|---|---|
| Technical feasibility | Low to moderateAI must predict choices nobody made, from slow results in few patterns. It starts from the engineers' rock model and keeps the plan when unsure. [A] | ModerateReal tests, passes and records are ordinary practice. Predicting new makers' polymers is uncertain, but real tests still decide. [B] [C] |
| Economics | Unknown; direct savingActs on polymer spending itself. Each Rp1 billion of yearly cost needs about 18 tonnes saved, at about Rp54 million a tonne. How much PHR could avoid is unknown. [E] | Unknown; indirect savingA small price cut could repay it if tonnage is large, but only if a second maker offers. AI must repay its extra cost over a spreadsheet. [E] |
| Customer value | ModeratePHR could get more oil per tonne and steadier orders. It still has the same supplier. | High, if rivals qualifyPHR could choose between proven offers before it needs them. This goes after the dependence itself, though the harm is inferred. |
| Competitive positioning | Easy for PHRPHR holds the well records and can adopt it inside today's work. That leaves little room for an outside seller without its data. | ModeratePHR's growing test record would be hard to copy. The current maker could answer with a lower price or local production. |
| Risks | Moderate to highIf engineers cut polymer too early on a wrong forecast, PHR may lose oil for good. Minimum amounts, small steps and engineers' approval limit the damage. | Moderate to highSKK Migas may require a product name, makers may send nothing, and engineers could wrongly pass a polymer that harms wells. Today's route stays as fallback. |
| How it would be tested | Replay Area A month by month with later readings hidden, against the engineers' trend-and-cost rule; then run silently before any change in one pattern. | For one coming area, compare today's qualification, an open bench with a spreadsheet, and the bench with AI, counting proven polymers, real offers, laboratory days and wrong passes. |
Which is worth pursuing?
For each, suppose the arrangement can be made to work and the AI part is practical. Would it create enough value to justify the change?
Improve: potentially yes
Of the ideas we studied, this is the one where AI could contribute most, because the forecast is most of what is new. For scale, our earlier research assumed Rokan’s polymer floods might use 2,300 to 18,200 tonnes a year by about 2030. Saving 1% would then be worth about Rp1.25 billion to Rp10 billion (US$76,000 to US$600,000) a year at the study price. [E] PHR’s real tonnage and the software’s cost are unknown.
It is best placed with an established company, PHR, which holds the well records and the authority. It is worth the change if:
- patterns respond differently enough for moving polymer to matter;
- the forecast beats the engineers’ own rule on months it has not seen;
- the approved plan lets engineers change polymer by pattern;
- the polymer saved is worth more than the system and any oil lost.
Reinvent: potentially yes
Only this change goes after the dependence on one channel. Suppose the bench costs Rp1 billion (about US$61,000) a year. On the same assumed tonnage, a price cut of about 0.1% to 0.8% would repay it. [E] The AI’s share is modest and unproven, so the AI must earn its own extra cost, by saving laboratory time or bringing in one more usable offer.
PHR is best placed here too: it owns the tests, the decisions and the purchase. A new polymer maker would gain a way in. It is worth the change if:
- a second polymer can meet Minas’s conditions at an acceptable price;
- SKK Migas and the buying rules accept a behaviour instead of a named product;
- makers will send samples without a promise of volume;
- for the AI part, PHR holds enough comparable old tests, including failures.
Our answer: both, for different reasons
Both are worth pursuing, but start the bench without waiting for AI. The bench answers the supply problem, and its basic form needs only open samples, clear rules and a spreadsheet. Improve answers the cost problem, and that is where AI might add most. PHR can test that forecast on records from Area A before it changes any injection. If the forecast cannot beat an engineer’s simple rule, PHR should keep the rule.
What would have to be tested
Improve: replay Area A. Give the software each month’s readings with the later months hidden. Compare its choices with the engineers’ rule and with what happened. Before that, PHR’s engineers should agree how much oil each pattern would probably have given with plain water, so they can judge what the chemicals added. Then let it run silently. Only then, with approval, try using less polymer in one pattern. Area A may hold too few patterns to tell; in that case PHR should collect planned comparisons first.
Reinvent: one coming area, three ways. First, hide whole polymers from old records and see whether AI predicts them better than simple rules. Then compare today’s method, an open bench with a spreadsheet, and the same bench with AI. Count the proven polymers, real offers, laboratory days and wrong passes. Drop the AI if the spreadsheet does as well. PHR should give up the larger change if no second polymer passes, makers stay away or SKK Migas requires a named product.
The missing evidence, and what each piece decides:
- PHR’s tonnage, price and any past supply trouble: whether either change pays.
- Where Minas’s polymer comes from, and who wins the next supply contract: whether the dependence is real and whether a bench could change the buying.
- Area A’s records by pattern: whether patterns differ, and whether the forecast can work. One official report compares Area A’s oil with its output before injection; another compares the combined result of two fields with a target. Neither shows what polymer alone did. [1] [2]
- Old polymer tests, and how long each stage took: whether AI has anything to learn from, and whether the laboratory is even the slow part.
- The approval and buying rules: whether polymer can change by pattern, and whether a behaviour can replace a named product.
Research Notes
What this investigation is based on
What Could Work’s stored desk research on chemical flooding at Minas (the sources below) and our own analysis of how the work is done and where AI could change it. We made no interviews, saw no PHR operating or contract records, and ran no pilot.
Whose problem, and why. We considered PHR, Elnusa Petrofin, SNF and Daqing Oilfield, the Chinese company that is Pertamina’s technology partner. The article follows PHR because it runs the flood, has production targets that give it a reason to act, holds the well and laboratory records, and can fund a change whose effects reach the other parties. For the others, the research showed no comparable reason to act on this problem.
Sources
- Dunia Energi, 16 November 2026. Minas output, water, oil remaining, and the 174%-of-target result, which combines Minas with another field. Read in full.
- Listrik Indonesia, 22 June 2026. SKK Migas’s head on Areas A to F, the 300% result in Area A, and polymer “masih diimpor” (still imported). Read in full.
- Indonesia Business Post, 14 June 2023. Elnusa Petrofin and SNF exclusive distribution, 2023–2026, for polymer injection in Pertamina Group areas. Does not name Minas; no volume or price. Read in full.
- Katadata, 10 July 2026. Reports the 23 December 2025 statement that the chemicals are fully domestic. Conflicts with [2]. Read in full.
- Investortrust, 21 December 2025. PHR on what each chemical does. Read in full.
- Dunia Energi, 25 November 2023. One bidder’s account of PHR’s chemical tender: formulation, trial, full-scale. Surfactant-led; does not say the stages apply to polymer. Read in full.
- Indonesia Business Post, June 2024. SKK Migas project list, including Minas-D Stage 1 (polymer), 505 million barrels of potential.
- Polymer Flooding, IntechOpen chapter. Polymer cost of US$1–4 per extra barrel in other floods; monitoring practice. Not about Minas. Relevant sections read.
- IATMI symposium study. Polymer at US$3.3 per kilo as a study input. Abstract only; not PHR’s price.
- Our earlier investigation on What Could Work: Should someone build a polymer plant in Riau for the Minas oil field? (16 November 2026).
Our explanations and assumptions
Where a note discusses a kind of AI, it draws on our AI Capability Atlas, What Could Work’s own reference on what today’s AI can do. For each kind of task it records what goes in and what comes out, how proven the approach is, its typical failures and how to check for them. Established means proven methods exist for a narrow, well-defined task. Conditional means it can work, but reliability depends heavily on the setting and has to be tested there. Exploratory means it is still unproven beyond experiments. The Atlas describes AI in general; nothing in this article has been tested in the business it describes.
- Forecasting each pattern under different choices. Here AI estimates the oil that would follow if the crew continued, cut, changed or stopped polymer, and proposes the next step. Our AI Capability Atlas rates estimating “what would have happened under another choice” as conditional even with a validated model, and exploratory when applied without limits. It warns that changing one input in a forecast does not prove cause. Learning a step-by-step policy is also conditional, with few documented uses; slow results and conditions unlike the past are typical weaknesses. Ranking known choices is established in bounded settings and conditional for consequential decisions. Choosing the next test is established for conventional formal methods, not for AI judgment.
How this shaped the article: the forecast starts from PHR’s rock model, gives ranges, keeps the plan when unsure and leaves approval with engineers. Technical feasibility is rated Low to moderate, and the first test changes nothing in the field. - Predicting an untested polymer and matching old records. AI estimates the behaviour of a material from past tests, and proposes which differently named records mean the same thing. The Atlas rates outcome prediction as established for validated, stable targets and conditional when the cases are selected or changing, as new makers would be. It warns that past records can carry past choices. Matching records is established only for conventional known conversion tables; AI-proposed matches are conditional, and identical names can mean different things.
How this shaped the article: record owners confirm every match, no polymer passes on a prediction, and the test hides whole polymers to see whether predictions hold for new ones. - Choosing and laying out tests. AI’s predictions feed a ranking of the tests most likely to change a decision. The Atlas rates both choosing tests and designing experiments as established for conventional formal methods, not for AI models. Heuristic or complex adaptive choices are conditional. It warns that easily measured doubts may not be the important ones, and that repeated checking can mislead.
How this shaped the article: the ranking is described as fed by AI, not as proven AI. Engineers approve every test, and a fixed test order is a comparison. - Sending doubtful polymers to full testing. Software marks a polymer unlike those it has seen. The Atlas rates deferring by explicit limits as established for conventional software; AI judging its own reliability across changing cases is conditional. Too much deferral can overload people, and too little hides risk.
How this shaped the article: doubtful cases always get full tests, real tests decide every case, and wrong passes are counted in the experiment. - Economics. No cost of either change is known; the figures below are scale illustrations, not forecasts.
Item Calculation Status Polymer, one tonne 1,000 kg × US$3.3 × Rp16,500 = Rp54.45 million Study price [9]; exchange rate assumed Rokan polymer use 2,300–18,200 tonnes a year by 2029–2031 Assumption-built From our earlier investigation [10], from the 505 million barrels [7]; not PHR’s figure 1% of that use 23–182 tonnes ≈ Rp1.25–9.9 billion a year Illustration Each Rp1 billion of yearly cost Rp1 billion ÷ Rp54.45 million ≈ 18.4 tonnes ≈ 0.8% of 2,300 or 0.1% of 18,200 Break-even Improve needs: assembling pattern data and agreeing a no-chemical baseline; a forecast for each of, we assume, three Area A patterns; about one extra well test per pattern a year; upkeep and engineers’ review. It must beat a monthly review with trend lines and a cost limit. Reinvent needs: aligning old tests; software; extra tests for, we assume, two challenger polymers a year; one limited field trial; upkeep and an independent reviewer; and a separate small stock. It must beat the same bench with a spreadsheet. PHR would pay. Chemical spending is reported to be recovered from the state’s share of production; we have not verified this. If so, the state would bear part of the cost and share the saving.
- The process walk-through and both comparison tables are our reading of public reports. Patterns, testing order and the split of work between PHR and Elnusa Petrofin at Minas are partly inferred. PHR’s exact tests are not public; Reinvent’s starting signal and its two-polymer minimum are our proposals.
- Other ideas we considered. For Improve, choosing the next polymer test by what is still uncertain, and adjusting the mixture before a change in water reaches the mixer. The first overlaps with Reinvent and stops at the field trial; the second would answer fastest, but an ordinary thickness meter may do most of it. Others, such as a reusable test file, comparing offers by thickening power and planned stock, are worth doing without AI. For Reinvent, comparing two polymers inside new patterns needs a second proven polymer first; finishing polymer beside the field depends mostly on an ordinary plant; and planning patterns and supply together relies mainly on conventional planning software.
Evidence status of the main claims
| Claim | Status |
|---|---|
| Minas produces about 25,000 barrels of oil and 4 million of water a day | Reported [1] |
| Minas polymer is imported | Reported [2]; an earlier statement conflicts [4] |
| One foreign maker held an exclusive group channel, 2023–2026 | Reported [3]; Minas not named |
| The dependence harms PHR | Inferred; no loss reported |
| Testing favours the polymer already in use | Inferred |
| AI can choose polymer amounts better than engineers’ rules | Hypothesis |
| A standing bench yields two or more real offers | Hypothesis |
| AI saves test time on that bench | Hypothesis |
Open questions
- How much polymer will PHR buy for Areas B and D, and at what price?
- How will polymer be bought after the exclusive, and does SNF’s polymer go to Minas at all?
- Is Minas polymer imported, and has supply ever caused a loss or delay?
- Can another polymer match the one in use, at a price PHR would accept? Would PHR buy from outside its present channel?
- Will Daqing or another partner bring its own polymer to Areas C, E and F?
- Is there truly no polyacrylamide plant in Indonesia? Our evidence is one search-result summary of a paper we could not open.
- Does the local-content price preference described in 2013 still apply?