Could AI help a Morowali nickel smelter burn less coal without risking its power?

A smelter that needs power every minute, and the coal that supplies it

Morowali is a district on the east coast of Central Sulawesi, one of Indonesia’s large islands. It is home to the Indonesia Morowali Industrial Park, known as IMIP: a vast industrial estate where companies process nickel ore into metal. One of them is Nickel Industries, an Australian company that runs 12 nickel smelting lines in or near the park. [3]

Each line heats ore in a long rotating kiln and then melts it in an electric furnace. The furnaces run day and night, so the company needs a steady supply of electricity every minute. A cut can halt production.

That electricity does not come from Indonesia’s national grid. It comes from captive coal plants: power stations built inside the park to supply its own factories. Across Indonesia, nickel processing used more than 81 terawatt-hours of captive power in 2025, and over 94% of it came from coal, according to the energy research group Ember. [2] Smelters buy that coal at market prices. The government’s capped price of US$90 a tonne for domestic industry does not apply to them. [6] In early November 2026, the government’s reference price for low-energy coal stood at about US$69 a tonne. [7]

Nickel Industries wants to burn less of it. In 2023 it signed a lease with SESNA, an Indonesian solar developer. SESNA would build a solar farm with a battery for the company’s Morowali smelters. The company expected it to cover 18 to 20% of its energy needs. [3]

In April 2026, two state-owned lenders financed a larger version: the bank BNI and the infrastructure financier PT SMI. The plant has 262 megawatts of panels at peak sun and an 80 megawatt-hour battery, built by SESNA with Sembcorp Energy Indonesia. It will sell all its power to a Nickel Industries subsidiary. [4] Our earlier investigation on What Could Work found that the project aimed to start operating in early 2027. It also found that Nickel Industries called its solar price well below its existing power costs, without saying what the price was. [8]

A news story makes the question timely. In late October, a coalition of young climate campaigners marched in Jakarta against coal. They named nickel processing in Sulawesi and North Maluku as a source of pollution and forest loss. Captive coal plants in these mining regions had 15.4 gigawatts of capacity in 2025, according to the researchers they cited. [1]

One day of power for the furnaces

Here is how a day’s electricity reaches the furnaces once the solar farm is running. Some of the steps are our reading of the reporting; nobody has published the site’s operating procedures.

  1. Nickel Industries’ operations staff set how much power the smelting lines need and how short an interruption they can bear. Those figures are not public.
  2. The power company that runs the coal plant buys coal at market price and keeps a stockpile. Whether that company belongs to Nickel Industries or to the park is not stated in the sources.
  3. The coal plant burns the coal and sends electricity to the furnaces. A coal plant cannot be switched on and off like a light. It has a minimum level below which it cannot run.
  4. In daylight, the solar farm adds power, and the battery stores some to smooth out passing clouds. The park operator, PT IMIP, has to approve solar plants and helps keep the park’s power steady. It recommends batteries for that reason. [5]
  5. Through the day, the power operators (the staff who run the plants) decide how much each source supplies. They keep some coal capacity running as a reserve: spare power ready in case clouds cut the solar output.
  6. At the end of each period, Nickel Industries’ finance staff match meter readings, coal records and contract charges with each supplier, then pay.

The difficulty sits in step 5. Solar only saves money when it actually replaces coal that would otherwise be burned. If operators keep coal plants running high as insurance against clouds, or cannot turn them down below their minimum level, some solar power is wasted and less coal is saved.

The margin is thin. The research behind this article estimated that the coal burned for each kilowatt-hour costs roughly 4 to 5 US cents. [E] Electricity from large solar plants in Indonesia costs 5 to 10 cents per kilowatt-hour to produce, all costs included, according to the energy think tank IESR. [9] So solar does not obviously cost less than the coal it replaces. Nickel Industries says its own solar price is below its current power costs, but not by how much. Every kilowatt-hour of solar that fails to replace coal eats into a saving that may already be small.

So the problem, in one sentence: Nickel Industries needs electricity that costs less and emits less, but any change must keep its furnaces running, and the savings, start date and connection terms are still uncertain.

Improve: power forecasts that show a range, not one guess

The Improve idea changes one step: how the power operators plan the next hours of supply.

Today, as we understand it from the reporting:

  1. The power operators check how much power the furnaces are drawing and what each plant can deliver.
  2. A member of the operating staff, we assume, prepares a single best guess of the coming hours’ demand and, once the farm runs, its solar output.
  3. The operators decide how much coal capacity and battery charge to hold ready, with a safety margin on top.
  4. The operators approve the plan and run the plants.

With the change:

  1. The operators check the same readings. Ordinary software flags any meter that is missing or out of date.
  2. A forecasting program, trained on the site’s own records of demand, solar output and weather, gives a range for each hour ahead: the likely solar output and how low it could plausibly fall.
  3. Planning software uses that range, with the same fixed limits as today (the coal plant’s minimum level, the battery’s size, the reserve rules), to suggest how much coal capacity to hold ready.
  4. The operators compare the suggestion with their own plan and decide. The software controls nothing.

This step matters because reserve held “just in case” burns coal. If the operators know how far solar could realistically drop in the next few hours, they may be able to hold just enough. That is our hypothesis; nobody has measured how much reserve the site holds today.

What the AI does. The forecasting program learns patterns from history: how the furnaces’ demand moves, and how the solar farm’s output follows the weather. It produces a range rather than one number, so the operators can see the uncertainty. [A]

Related Business Opportunity:  Could Bali's Bamboo Buyers Help Pay for the Next Generation of Growers?

Why AI, and not a rule. Simple rules already exist: “tomorrow will look like today” or “the same hour last week”. The AI only earns its place if its forecasts beat those simple rules by enough to change what the operators decide. That has to be tested. A new solar farm also has no history yet, so the forecast would start weak and improve as records build up.

What needs no AI. Checking the meter data, the planning arithmetic that respects the plants’ limits, and every decision. Proven planning programs of this kind are not AI. [B]

Step Today With Improve
Forecast One best guess Prepared by staff A range per hour From a program trained on site records
Reserve plan Staff judgment Safety margin on top Software suggestion Same limits, sized to the range
Bad data Depends on staff Spotted by eye Flagged automatically Falls back to today’s plan
Decisions Unchanged Operators approve every plan and run the plants

Nickel Industries’ own power team, or the company running its power plants, would use it. Either could buy it from a software supplier. It cannot help before the solar farm is running. It cannot save coal if the coal plant is already at its minimum level, if the battery has no spare room, or if the contracts mean someone else keeps the saving. And it does not touch what may be the real bottleneck: getting the solar built, connected and approved.

Reinvent: one company answerable for the whole power supply

The Reinvent idea starts from what Nickel Industries actually wants: power at the furnaces that never fails, costs less and emits less. It asks whether the work would still be split up the way it is if it were organised from scratch.

Today, as the reporting suggests:

  1. Nickel Industries sets its power needs.
  2. The power company buys coal and runs the coal plant under one arrangement.
  3. SESNA and Sembcorp build and run the solar farm under a separate contract, and the park operator approves the connection.
  4. The power operators balance the sources.
  5. Nickel Industries’ finance staff settle with each supplier separately.

Each party answers for its own piece. Nobody is clearly answerable for the trade-offs between them, such as how much coal reserve to keep while the solar runs. That gap is our inference; the reporting does not show whether it exists.

The new way of working:

  1. Nickel Industries writes down one service it wants: power at the furnaces, the interruptions it can bear, and its cost and emissions targets.
  2. It signs a mandate with one power-service manager. That company takes responsibility for coordinating coal, solar, battery and reserve to meet the service. The existing contracts stay in force.
  3. Each plant owner shares its meter, fuel and availability records with the manager. Software proposes how to match records that each owner keeps in its own format, and each owner approves the matches.
  4. Forecasting software predicts demand and solar output, as in the Improve idea. Planning software then suggests one combined plan for the coal plant, solar, battery, reserve and coal purchases.
  5. Each plant’s own operators approve and carry out their part. Engineers test any new solar plant and alone decide when it can be relied on; until then, the plan leaves it out.
  6. An independent checker, appointed by Nickel Industries and paid separately from the manager, works out the cost, the coal burned and the emissions from the meter records. Nickel Industries’ finance staff approve and pay.
Step Today With Reinvent
What is bought Separate supplies Coal power and solar, each on its own terms One power service Agreed continuity, cost and emissions
Who balances sources Each plant’s operators No one answers for the mix The service manager Answers for the whole mix
Records Kept by each owner In its own format Shared and matched Owners approve each match
Checking results Supplier by supplier Finance staff reconcile Independent checker Cost, coal and emissions from meters
Running the plants Unchanged Each plant’s operators run it; engineers approve new equipment; contracts stay

Where AI does the work

  • Forecasting demand and solar output. The same kind of program as in the Improve idea, with the same caveat: it must beat simple rules. [A]
  • Matching records across owners. The coal plant, the solar farm and the finance team each label meters and time periods their own way. A program can propose which fields mean the same thing, but it can mix up units, so an owner checks every match. [C]
  • What needs no AI. The combined planning is long-established planning mathematics. Ordinary workflow software keeps track of who has done what and which issues are open. [B] [D]

The honest finding is that the heart of this idea is a contract, not AI. Better forecasts or tidier accounts can be added to today’s arrangement without changing anyone’s responsibilities. What they cannot do is make one party answerable for the whole mix of coal, solar and reserve. Only the new mandate does that. Most of its value, if any, may come without AI at all.

It also reaches beyond today’s process. It adds two roles that do not exist in the reporting: the service manager and the independent checker. People still make every decision that matters. Nickel Industries sets the service, the plant operators run the plants and keep control in an emergency, engineers approve new equipment, and finance staff approve payment.

The limits are serious. Nobody has shown that today’s arrangement lacks this kind of coordination. If one party already holds these responsibilities, the idea adds nothing. SESNA and Sembcorp, their lenders and the park operator would all have to agree to share data and accept the new arrangement. No company has been identified to take the role. A contract cannot replace physical reserve: long cloudy spells and plant failures still need real backup capacity. And putting one company in charge also concentrates the risk of failure in one place.

The idea is also different from the business our earlier investigation looked at. That investigation asked whether a new developer could sell extra solar to nickel producers sooner than today’s providers. It found that financed solar already serves them, so a newcomer would need a site where faster delivery saves the buyer money. [8] This idea sells no new solar. It is about getting more value out of the power supply Nickel Industries has already contracted.

What each change could offer

Neither idea has been tried at Morowali, so the table judges potential: how well each could do if it were built and run sensibly.

Favourable for the business Mixed Unfavourable

Potential Improve: power forecast ranges Reinvent: one accountable power service
Technical feasibility ModerateForecasting regular patterns is an established use of AI, but a new solar farm starts with no history and the forecast must beat simple rules. The planning software is proven and not AI. [A] [B] ModerateForecasting, planning and tracking are practical; matching records across owners is less proven. The hard parts are physical backup and partners' rights, not software. [C] [D]
Economics Unknown, likely modestCheap to try, but the saving is reserve coal not burned, which nobody has measured, and it depends on the coal plant having room to turn down and on Nickel Industries keeping the saving. [E] Unproven, costly to set upNeeds negotiated mandates, connections to every owner's meters, a service team and an independent checker; the saving is unsized and must also cover contracts that still have to be honoured. [E]
Customer value ModestThe furnaces get the same power; Nickel Industries may burn somewhat less coal and gets plans that show uncertainty. Potentially highOne party answers for cost, reliability and emissions together, which is what Nickel Industries wants, but only if today nobody does.
Competitive positioning Easy for incumbentsNickel Industries' power team or its power company can adopt it quickly, which suits them; for the same reason there is little room for a company built only on selling it. ModerateWhoever holds the mandate and the shared records would be hard to replace, but the role depends on partners' consent; an existing developer such as SESNA starts with the relationships. [4]
Risks Low, if kept advisoryOperators keep every decision and the plan falls back to today's method when data are missing; the danger is staff trusting a wrong forecast and holding too little reserve. HighA furnace stoppage outweighs any planning gain; responsibility and failure concentrate in one company; partners may refuse; a contract cannot replace physical backup capacity.
How it would be tested Replay past records to compare the forecasts with simple rules, then run the tool in shadow beside the operators for a few months, measuring forecast error, reserve held, coal burned and solar wasted at the same demand. Audit who holds which rights and responsibilities today; if a gap exists, replay past months and run the service in shadow through to the invoices, comparing today's arrangement, the service with ordinary software and the service with AI.
Our assessment of potential: how well each could do if it were built and run sensibly. Ratings are editorial judgments built from the research and from what our AI Capability Atlas says about each kind of AI; none is a measured result. The colour shows whether a rating helps or hurts the business case, so high risks show red. The last row says how each idea would be tested; it is not rated.

Which is worth pursuing?

For each idea we ask: if the arrangement can be made to work, and the AI part is practical, would it create enough value to justify the change?

Related Business Opportunity:  Could a nickel-monitoring consultancy win business from banks in Indonesia?

Improve: potentially yes, as a modest saving

The forecasting is practical, cheap to try and easy to switch off, because the operators keep every decision. Whether it is worth paying for depends on how much reserve coal it could save, and nobody knows that yet. Nickel Industries’ own power team or its power company is best placed to adopt it, perhaps buying the tool from a software supplier. It is no reason for a new company to exist. It is worth it on four conditions:

  • the solar farm is running and delivering;
  • the coal plant and battery have room to change how much they produce;
  • Nickel Industries, not only its suppliers, keeps the coal saving under its contracts;
  • the forecasts beat simple rules by enough to cover their running costs.

Reinvent: potentially yes, but it is a contract question first

If one company could answer for the whole power mix, Nickel Industries would get what it actually wants: cost, reliability and emissions managed together. But the value rests on a gap nobody has shown, and on several partners giving up some control. AI is not what makes it work. Either an established player or a new company could take the role. An existing developer such as SESNA, or Nickel Industries’ own energy team, already holds the relationships. A contracted newcomer would have to win them. Neither is shown to be better placed. It is worth it on four conditions:

  • today’s arrangement really leaves no one answerable for the mix;
  • the plant owners, lenders and park operator grant the manager real rights to data and coordination;
  • the savings Nickel Industries keeps exceed the manager’s fees, the set-up costs and the contracts it still has to honour;
  • enough physical backup capacity exists to keep the furnaces running.

Worth pursuing: Improve, first. Nickel Industries can test the forecasting tool without touching the furnaces, by running it beside the operators and comparing its suggestions with what they did. That test also measures how much coal the solar farm actually saves, which is the number Reinvent needs before anyone should negotiate a new contract. Reinvent may be the bigger prize, but it is mainly a contract question, not an AI one, and its central premise is unproven.

What would have to be tested

For Improve, Nickel Industries’ power team, with its engineers and finance staff, would run a test beside the operators. First, they replay past records to compare the program’s forecasts with simple rules. Then they run it in “shadow” for a few months, where it makes suggestions but controls nothing. They measure forecast error, how much reserve each plan would hold, coal burned and solar wasted at the same demand, and how often the operators reject a suggestion. The engineers stop the test if it suggests anything that breaks a plant limit.

For Reinvent, Nickel Industries would start with an audit before any experiment, listing who holds which rights, data and responsibilities today. If one party already answers for the mix, Nickel Industries should drop the idea. Otherwise, it would replay past months under the proposed service, with its partners’ consent, and then run the service in shadow through to the invoices. It would compare three versions: today’s arrangement, the same service with simple forecasts and ordinary software, and the service with AI forecasting and record matching. The idea fails if the service adds nothing beyond the Improve forecasting tool, or if the AI adds nothing beyond simple forecasts.

The missing evidence, and what each piece decides:

  • What Nickel Industries pays for its solar and for its coal power. This decides whether any saving is large enough to matter for either idea.
  • Whether the solar farm is operating, and when it started. Neither idea can save coal before it runs.
  • The coal plant’s minimum level and how much reserve the operators hold. This decides how much coal better planning could save.
  • Who owns and runs the coal plant, and who keeps any saving under the contracts. If Nickel Industries does not keep it, neither idea helps the company.
  • Whether anyone today is answerable for the whole power mix. If someone is, Reinvent adds nothing.
  • The park operator’s connection and battery rules for this project. These set the limits for both ideas.

Research Notes

What this investigation is based on

What Could Work’s stored research on solar power for Morowali’s nickel smelters (the sources below), and our own analysis of how Nickel Industries’ power supply works and where AI could change it. We reopened the main cited sources to check the facts the article relies on. No interviews or pilots were carried out, and no site records were available.

Related Business Opportunity:  Could AI help Adaro's river barge company deliver coal through the Barito's dry season?

Whose problem this article takes, and why. The research names several parties: the communities around the smelters, Nickel Industries, the park operator PT IMIP and the solar developer SESNA. The article follows the one that can act on the change: it runs the processing that needs the power, has a documented reason to act (its fuel costs and its own emissions goals), is a large company with the means to fund a change, and its operations produce the records a change would use. The communities bear the pollution but do not run the power supply. The park operator has wide reach but no documented reason of its own to change Nickel Industries’ power.

Sources

  1. Koalisi Orang Muda Serukan Keadilan dalam Proyek Transisi Energi, Mongabay Indonesia, 11 November 2026. The news report behind this investigation: a youth climate coalition’s protest in Jakarta; cites CREA data of 15.4 GW of captive coal capacity in extractive regions in 2025.
  2. Produksi Listrik PLTU Captive Indonesia Tembus 50% di Atas PLTU On-Grid, Investortrust, reporting Ember’s 2026 analysis. Nickel processing used more than 81 TWh of captive power in 2025, over 94% from coal. A sector estimate, not Nickel Industries’ own figures.
  3. Tambah porsi bauran energi, Nickel Industries gandeng Sumber Energi Surya Nusantara, Kontan, 4 October 2023. Nickel Industries is Australian and runs 12 smelting lines at or near IMIP; the 2023 lease with SESNA for 200 MWp of solar and a 20 MWh battery, about US$150 million, 18–20% of its energy needs.
  4. Ashurst and ADT Law advise BNI and PT SMI as lenders on a 262 MWp solar and 80 MWh BESS project in Indonesia, Ashurst, 21 April 2026. US$151.6 million of project finance; developed by Sembcorp Energy Indonesia and SESNA; all power sold to a Nickel Industries subsidiary. Financing does not show that the plant is operating.
  5. Siaran pers: PT DSI Bangun PLTS Atap di Kawasan IMIP, PT IMIP, 24 January 2026. Another tenant’s 65.89 MWp rooftop solar with a 22 MWh battery; the park operator approved it, supports frequency stability and recommends batteries; its grid connection was still under negotiation. A precedent for another company, not Nickel Industries’ terms.
  6. PLTU Mandiri Milik Smelter Tak Masuk Skema DMO Batubara, Kontan, 3 November 2026. Smelters’ captive plants buy coal at market price; the US$90 a tonne domestic industry price does not apply to metal processing.
  7. HBA November Turun Tipis, Harga Batu Bara Kalori Rendah Justru Naik, Ministry of Energy and Mineral Resources, November 2026. Reference price for 4,100 kcal/kg coal: US$69.28 a tonne for 1–14 November 2026.
  8. Our earlier investigation on What Could Work: Could faster solar delivery win Indonesia’s nickel producers as customers? (6 November 2026). It found that financed solar already serves nickel producers and that a new developer would need a site where faster delivery saves the buyer money; it reported the Morowali project’s target of operation in early 2027 and Nickel Industries’ statement that its solar price was materially below its existing power costs.
  9. PLTS Indonesia Ternyata Lebih Mahal dari India, Listrik Indonesia, 18 October 2026. IESR: large-scale solar in Indonesia costs 5–10 US cents per kWh. A national range, not this project’s price.

Our explanations and assumptions

Where a note discusses a kind of AI, it draws on our AI Capability Atlas, What Could Work’s own reference on what today’s AI can do. For each kind of task it records what goes in and what comes out, how proven the approach is, its typical failures and how to check for them. Established means proven methods exist for a narrow, well-defined task. Conditional means it can work, but reliability depends heavily on the setting and has to be tested there. Exploratory means it is still unproven beyond experiments. The Atlas describes AI in general; nothing in this article has been tested in the business it describes.

  1. Forecasting demand and solar output. A forecasting program learns from time-stamped history (demand, solar output, weather) and estimates future values with a range. Our AI Capability Atlas rates this kind of forecasting as established for regular, repeating patterns and conditional when the history is short or conditions change. It warns that long horizons and sudden shocks reduce reliability and that a single figure hides uncertainty. Its check is to test forecasts on past data against simple rules, and to check how often the real value falls inside the stated range. How this shaped the article: it is why both ideas use a range rather than one number, why the forecast must beat simple rules before it counts, why we note that a new solar farm starts with no history, and why technical feasibility is rated Moderate rather than High.
  2. Planning the supply and cleaning the meter data. Planning software allocates limited capacity (coal plant, battery, reserve) against costs and fixed limits. Data-cleaning software filters meter readings and estimates the current state of the system. The Atlas rates both as established when the system is well specified, but marks that rating as applying to proven conventional software, not AI. It rates them conditional when conditions keep changing, and warns that a mathematically good plan can exploit a limit nobody wrote down, and that forecast errors can outweigh what the planning gains. How this shaped the article: it is why we say these parts need no AI, why the same fixed limits apply with and without the change, and why operators approve every plan.
  3. Matching records across owners. A program reads the field names, units and sample values in different owners’ records and proposes which ones correspond. The Atlas rates this as established for known conventions and published lookup tables (ordinary software), and only conditional when a model proposes the matches across undocumented systems. It warns that identically named fields can mean different things and that mismatched units or time periods must be surfaced. How this shaped the article: it is why each owner approves every match in the Reinvent idea. This use was added in the Reinvent analysis and is not part of today’s process map.
  4. Tracking the work. Workflow software follows a set sequence of authorised steps, waiting states and hand-offs, and keeps open issues visible. The Atlas rates this as established for bounded workflows, which is proven ordinary software, conditional when AI agents adapt the workflow, and exploratory for unrestricted autonomous operation. It warns that each step succeeding does not prove the whole job succeeded. How this shaped the article: it is why tracking is described as ordinary software, why nothing is executed or paid automatically, and why an independent checker confirms the results.
  5. The economics. The coal cost of 4 to 5 US cents per kWh (more precisely, about 4.2 to 5.2) is the stored research’s own estimate, derived from the November 2026 reference coal price with assumptions about delivery and plant efficiency. It is not a published figure or Nickel Industries’ cost. The 5 to 10 cents for large solar is a national range [9], not this project’s price. For both ideas, our analysis listed what each would need but could not price any of it:
    • Improve: one connection to the site’s data and planning systems, data preparation, engineering checks and operator training (one-off); then the forecasting service, weather data, operator review and model upkeep (yearly).
    • Reinvent: negotiating the mandate and consents, a study of rights and data, connections to every owner’s meters, a shared register and training (one-off); then the service, staffing, an independent checker, upkeep and any extra reserve capacity the engineers require (yearly).

    Break-even: each idea pays only if the yearly saving Nickel Industries keeps is larger than its yearly costs plus a third of its one-off costs (spreading them over three years). For Improve, the saving is coal not burned and solar not wasted, compared with the same planning done using simple forecasts. For Reinvent, it must also cover the contracts that still have to be honoured, and the AI parts must add a saving beyond the same service run with ordinary software. No figure for any cost or saving exists in the records, so none is given.

  6. Other ideas we considered. For Improve, the strongest alternative was software that reads meter reports, invoices and contracts so finance staff do not retype them; we did not feature it because it neither saves coal nor cuts emissions. We also set aside AI that controls the plants directly (too risky before planning value is shown), and several monitoring and reporting tools that ordinary software could match. For Reinvent, we also looked at splitting the park’s power into separately protected zones, each with its own reserve; it was dropped because nobody has shown the electrical layout allows it, and duplicated equipment could cost more than it saves.
  7. A correction to the stored research. The stored research said that only a small 409 kWp first phase of the Nickel Industries project was operating in February 2026. On rereading, the cited Katadata article gives that figure for a different SESNA project at a coal mine in East Kalimantan. We therefore make no claim about whether the Morowali solar farm is operating; the sources show it financed, not running. The “one day of power” walk-through and both “today / with the change” tables are our summaries of the process the research describes, not observed procedures. Morowali’s location is general geography.

Evidence status of the main claims

Claim Status
Nickel’s coal power Over 81 TWh in 2025, over 94% coal Reported Ember estimate [2]
Smelters buy captive coal at market price Observed [6]
Solar farm financed 262 MWp with 80 MWh battery for Nickel Industries Observed [4]
The solar farm is operating Not established [G]
The coal behind each kWh costs about 4–5 US cents Estimate [E]
Coal reserve held against clouds limits the coal solar saves Inferred Our reasoning
Range forecasts let operators hold less reserve Hypothesis
No one today answers for the whole power mix Inferred Not documented
One accountable service manager lowers cost and emissions Hypothesis

Open questions

  • What does Nickel Industries pay per kWh for its solar, and what does its coal power cost? Nickel Industries and SESNA could answer.
  • Is the Morowali solar farm operating, and how much does it deliver? Nickel Industries, Sembcorp or SESNA could answer.
  • Who owns and runs the coal plants that supply Nickel Industries’ lines, and how low can they run? The company or the park operator could answer.
  • Under the contracts, who keeps the saving when solar replaces coal?
  • What connection, battery and stability rules does the park operator set for this project?
  • Will the government’s planned cut to captive coal emissions be enforced? That could change the value of every saving.
  • Do buyers of nickel pay more for metal made with less coal? The research found no contract-level premium.