Should someone build a polymer plant in Riau for the Minas oil field?

Minas, an oil field in Riau that began producing in 1952, now pumps about 25,000 barrels of oil a day, and about 4 million barrels of water come up with it. Some 44% of its oil is still stuck in the rock [1]. To get at it, the operator, Pertamina Hulu Rokan (PHR, the Rokan subsidiary of the state oil company Pertamina), has started flooding the field with water thickened by chemicals. On 16 November 2026 SKK Migas, the state agency that oversees oil contractors, said the extra oil from that flooding reached 174% of target within three months [1].

The main chemical is a polymer: polyacrylamide, a white powder that, dissolved in the injected water, makes it thick enough to push oil ahead of it instead of slipping past. PHR buys it, along with a soap-like surfactant and an alkali. In June 2026 SKK Migas’s head said the alkali is made in Indonesia and the surfactant is PHR’s own patented formula, but the polymer “saat ini masih diimpor” (is still imported) [2]. Minas is about to need far more of it. So could a factory in Riau make it, and win PHR’s business?

Three chemicals, one still shipped in

Chemical flooding at Minas began in Area A in December 2025. PHR is now preparing Areas B and D, with Areas C, E and F to follow through partnerships, possibly with the Chinese operator Daqing; officials want all six areas at a peak of about 200,000 barrels a day by 2029–2030 [2][10]. The biggest planned piece is a polymer flood: SKK Migas’s 2024 list puts the extra oil from Minas-D Stage 1 at 505 million barrels [8]. Once a pattern of wells starts receiving polymer, it keeps receiving it for years.

Two of the three chemicals already have local suppliers inside the Pertamina group. Pertamina Lubricants, another subsidiary, blends, checks and delivers PHR’s surfactant; 3,400 tonnes went into the first three patterns of Area A [6][7]. The polymer goes another way. In 2023 Elnusa Petrofin, a Pertamina subsidiary that distributes fuels and oilfield materials, signed an exclusive deal to supply polymer from SNF, a French polyacrylamide maker, for Pertamina’s polymer-injection projects from 2023 to 2026 [3][4]. At the Rama offshore field Elnusa now supplies both the polymer and the units that dissolve and inject it [17].

How the three flooding chemicals reach Minas

  1. 1. Alkali
    Made in Indonesia
  2. 2. Surfactant
    PHR’s own formula, blended and delivered by Pertamina Lubricants
  3. 3. Polymer today
    Made abroad by SNF, supplied through Elnusa Petrofin under a 2023–2026 exclusive
  4. 4. Injection
    Powder dissolved and mixed in units run by PHR or Elnusa, then pumped into the wells
  5. 5. Proposed change
    Polymer made in Riau from imported acrylamide, sold to PHR per tonne
Alkali and surfactant already come from Indonesian suppliers; the polymer is reported to arrive from abroad. A Riau plant would replace the first polymer step.Based on sources [2] [3] [7] [17] and our own reasoning.

The record is not clean. At the Area A ceremony in December 2025, the same SKK Migas head was reported as saying the flooding chemicals were “sepenuhnya diproduksi dari dalam negeri” (fully made in Indonesia) [5]. His June 2026 statement is later and more specific, so we treat the polymer as imported, but nobody has said who makes it or where. A company registered as PT SNF Polymers Indonesia appears in business listings; we could not find out whether it makes anything here. A university plant-design paper says no polyacrylamide plant exists in Indonesia [16].

Why would this arrangement have lasted? Until Minas planned field-wide floods, polymer was needed only in pilot amounts, too little to justify a factory, so buying a proven grade from an established foreign maker through a group company was the simplest choice. That is our inference, not something PHR has said. It also means the choice is about to be made again, at a much larger scale, and the exclusive deal’s term ended this year [3].

What a Riau plant would sell, and why PHR might switch

The business we examine, a Domestic EOR polymer plant for Rokan’s next floods, would make polyacrylamide powder in Riau from imported acrylamide, the liquid chemical it is built from, and sell it to PHR by the tonne, separately from the injection service. It would bid only for patterns not yet injecting, in Areas B and D, so PHR would not have to swap a working polymer in a running flood.

Here is one tonne, start to finish. The plant buys acrylamide from China under a forward contract, at around US$1.0–1.2 a kilo in 2026 [15]. It turns it into polymer, dries and grinds it, bags it and checks each lot’s thickening power against the grade PHR has tested. A truck takes the bags to the injection unit at Minas, run by PHR or by Elnusa, where the powder is dissolved and pumped down. The plant invoices PHR per tonne; PHR gets a qualified polymer from a few hours away instead of a ship from abroad.

The reason PHR might buy is a rule. Indonesia’s upstream procurement regulation gives a price preference to goods with at least 25% domestic content, measured as a TKDN score [14]. With imported acrylamide at roughly half the cost, we estimate a Riau-made polymer would score around 40–50%, enough to qualify; an imported powder would not. Being made nearby also removes import lead times and dollar exposure for a chemical that is injected every day. The levers are price (through the preference), access and supply reliability.

Related Business Opportunity:  Could a company get Riau's independent oil-palm growers the price mills pay their partners?

Who else has to go along? SKK Migas gains local content on a cost it oversees, and acrylamide suppliers gain a customer, so both should be willing. PHR’s view is unknown: it gains local content and a short supply line, but gives up time to test a new grade and the convenience of a group supplier. So is a lender’s, which would want a firm order before funding a plant.

The two numbers that decide it

The first is the price gap. On our cost build, a plant running at about 80% of capacity would make polymer for about US$1.85–2.81 a kilo delivered, around US$2.3 in the central case. Only the acrylamide is a sourced price; energy, labour, equipment and freight are our assumptions. The only Indonesian price we found for comparison is US$3.3 a kilo, a figure researchers at a 2022 industry symposium used to cost a chemical flood [12]; it is not what PHR pays. We found no record of what PHR pays today, and that is the gap in the case.

Per kilo of polymer delivered to Minas US$ Basis
Acrylamide (1.05 kg per kg of polymer) 1.05–1.26 Sourced [15]
Freight, duty, energy, labour, equipment, trucking 0.80–1.55 Our assumptions
Plant’s cost, at about 80% utilisation 1.85–2.81 Estimate
Price used in an Indonesian flood study 3.3 Study input [12]

The weakest input is how busy the plant stays. At 40% of capacity the equipment charge per kilo doubles and the high end of the cost passes US$3.3. That makes the second number decisive: how much polymer Rokan will actually buy.

Start from the 505 million barrels [8]. Produced over about 20 years, that is about 25 million barrels a year at full output; if Areas B and D reach 30–60% of that by 2029–2031, and each extra barrel needs 0.3–1.2 kg of polymer (derived from reported polymer costs of US$1–4 a barrel [13]), Minas would use about 2,300–18,200 tonnes a year, worth roughly Rp 124–994 billion at US$3.3 a kilo. If a newcomer won a fifth to a third of that, it would sell about Rp 25–350 billion a year; the central case is about Rp 90 billion (about US$5.5 million), or some 1,700 tonnes. Counting buyers gives a similar picture: five Pertamina-group operators have polymer-bearing chemical-flood projects on SKK Migas’s list [8], each, we assume, placing one yearly order of Rp 25–250 billion.

That is enough for a plant of a few thousand tonnes in the central case, but only if it also sells the same chemical for water treatment and mining; at the low end it is not enough. A small operation would not do: this needs an established chemical producer, or a polymer maker other than SNF entering through a local joint venture, with a licensed process and the money to build.

The answer depends on who moves first

The most likely competitor is Pertamina itself. It localised the surfactant through its own subsidiary [7], and it could do the same with polymer, through Elnusa or another group company. SNF could cut its price, renew its exclusive deal or start making polymer in Indonesia. Daqing, if it takes over areas, may bring Chinese polymer with it [2][10]. Domestic firms do compete for Rokan’s chemicals: PT Luas Birus Utama was the only Indonesian company among seven finalists in a 2023 tender for them [9]. An independent plant’s advantage lasts only as long as it is first to be tested and approved; it is not defensible beyond that.

So, should someone build a polymer plant in Riau for Minas? Not on what is public today. The case is plausible: the coming floods are large, the cost build has room under the only price we have, and the local-content rule favours a domestic maker. But it rests on three facts no one has published: whether Minas polymer is in fact still imported, what PHR pays for it delivered, and whether PHR will put the Area B and D supply out to open tender rather than give it to a group company. The cheapest next step is to ask PHR or SKK Migas those three questions; a delivered price below about US$2.5 a kilo, a domestic source already supplying Minas, or a tender reserved for an affiliate would end the idea. Polymer producers, PHR procurement staff and anyone who has bid for Rokan’s chemicals could settle it quickly.

In short: documented, the floods, their planned size and the reported import of polymer; inferred, the cost advantage and the local-content score; unknown and decisive, today’s price, the polymer’s origin and who PHR will buy from.

What has to be true

The business described above stands on these claims, listed in the order we would test them.

  1. Polymer for Minas is still imported, so a locally made grade would add local content PHR cannot already get
    Our inference from the sources · PHR
    June 2026 statement by SKK Migas’s head says polymer still imported [2]; his earlier Dec 2025 statement, reported July 2026, said CEOR components fully domestic [5] [2] [5]
    Would break if: PHR confirms its polymer is already made in Indonesia
    Cheapest test: Ask PHR or SKK Migas who makes the polymer injected in Minas Area A and where
  2. PHR pays a delivered price for imported polymer high enough (about USD 2.8/kg or more) to leave a local producer a margin
    Not yet tested · PHR
    No record of what PHR pays was found; a 2022 study used USD 3.3/kg [12] [12]
    Would break if: Delivered price is below about USD 2.5/kg
    Cheapest test: Request the polymer line of PHR’s CEOR procurement or Elnusa’s supply price from SKK Migas or PHR procurement
  3. SNF does not already make polymer inside Indonesia
    Not yet tested · SNF
    An entity named PT SNF Polymers Indonesia appears in company listings; SNF’s plant list shows no Indonesian site [3]
    Would break if: OSS or SNF records show local polymerisation
    Cheapest test: Check OSS/BKPM business licences and ask SNF Indonesia what it produces
  4. PHR would award a polymer tranche to an independent producer rather than reserve it for an affiliate
    Not yet tested · PHR
    PHR localised surfactant through an affiliate [6,7]; its 2023 tender included a local non-affiliate finalist [9] [6] [7] [9]
    Would break if: PHR states Areas B/D polymer goes to Elnusa or another group company
    Cheapest test: Ask PHR procurement whether the post-2026 polymer supply will be tendered openly
  5. Areas B and D begin polymer injection at scale by about 2029
    Our inference from the sources · PHR
    PHR is preparing injection in Areas B and D [2]; officials target 200,000 BOPD [2]; Stage 1 slipped before [2] [8]
    Would break if: Plans of development show Areas B/D after 2031 or at pilot scale
    Cheapest test: Check SKK Migas work programme approvals for Areas B and D
  6. A locally made grade can match SNF’s polymer in core-flood tests
    Not yet tested · PHR
    Would break if: Local grade fails viscosity or injectivity specifications
    Cheapest test: Bench and core-flood test of a licensed grade against SNF’s at LEMIGAS
  7. The plant can run above about 70% utilisation, with flocculant-grade sales filling gaps
    Not yet tested · Plant operator
    Would break if: Rokan demand stays near the low case and flocculant buyers do not switch
    Cheapest test: Written quotes from water-treatment and mining polyacrylamide buyers
  8. A lender or investor would fund the plant against one anchor tranche
    Not yet tested · Plant investor or lender
    Would break if: Financing requires multi-year offtake PHR will not sign
    Cheapest test: Term-sheet conversation with a lender using a conditional offtake letter
  9. Monomer can be contracted near USD 1.0-1.2/kg delivered
    Our inference from the sources · Acrylamide monomer suppliers
    China 2026 forecast USD 1.00-1.20/kg [15] [15]
    Would break if: Delivered CIF Riau price above USD 1.5/kg
    Cheapest test: Request CIF quotes from two monomer suppliers
Related Business Opportunity:  What if a school’s paint order came with a lead check?

Research Notes

The sources, calculations and evidence records behind this investigation. Numbered citations in the article link here; ↩ returns to the text.

Sources

[1] Chemical EOR Minas dan Stimulasi Balam South Hasilkan Tambahan Produksi 174% dari Target (Dunia Energi, 16 Nov 2026). Dunia Energi, 16 Nov 2026. Full article. Minas output, produced water, oil remaining, 174% result. The anchor story. ↩

[2] Menaklukkan sumur minyak tua Minas (Listrik Indonesia, 22 Jun 2026). Listrik Indonesia, 22 Jun 2026. Full article. Area A injection since Dec 2025; Areas B and D in preparation; C, E, F through partnerships incl. Daqing; 200,000 BOPD target 2029–2030; alkali domestic, surfactant PHR’s patented formula, polymer ‘saat ini masih diimpor’. ↩

[3] Pertamina’s subsidiary, SNF SAS of France collaborate on polymer flooding (Indonesia Business Post, 14 Jun 2023). Indonesia Business Post, 14 Jun 2023. Full article. Elnusa Petrofin–SNF exclusive distribution for polymer injection projects, 2023–2026. ↩

[4] Gandeng SNF SAS, Elnusa Petrofin dukung target produksi minyak (Emitennews, 11 Jun 2023). Emitennews, 11 Jun 2023. Full article (read by an evidence reader). Same agreement. ↩

[5] Pertamina mulai injeksi chemical EOR di WK lepas pantai Sumatra (Katadata, 10 Jul 2026). Katadata, 10 Jul 2026. Full article. Rama offshore CEOR; quotes the Dec 2025 Minas statement that CEOR components are fully domestic. Earlier than source 2 and less specific. ↩

[6] Minyak lapangan tua masih berharga, PHR buktikan dengan CEOR (Investortrust, 2026). Investortrust, 21 Dec 2025. Full article (commissioned research). PHR’s CEOR programme and surfactant. ↩

[7] Pertamina Lubricants kembangkan produk CEOR untuk Rokan (Kontan, 7 Jul 2026). Kontan, 7 Jul 2026. Full article (commissioned research). Pertamina Lubricants blends, checks and delivers PHR’s surfactant; 3,400 tonnes on three Area A patterns. ↩

Related Business Opportunity:  Could a recruiter earn fees by testing vocational graduates for West Java factories?

[8] SKK Migas: Indonesia’s EOR potential reaches 950 million STB (Indonesia Business Post, 7 Jun 2024). Indonesia Business Post, 7 Jun 2024. Full article. SKK Migas EOR list: Minas-D Stage-1 polymer 505 mmstb; 10 chemical projects 745.6 mmstb; operators. ↩

[9] Satu-satunya perusahaan Indonesia ikut tender bahan kimia EOR Blok Rokan (Dunia Energi, 25 Nov 2023). Dunia Energi, 25 Nov 2023. Full article (evidence reader). PT Luas Birus Utama, only Indonesian finalist of seven in a Rokan EOR chemical tender; 50,000 t/yr chemical capacity. ↩

[10] Pertamina gandeng Daqing Oilfield untuk bisnis chemical EOR (Metro TV, Oct 2025). Metro TV, 14 Oct 2025. Full article (commissioned research). Pertamina–Daqing chemical EOR cooperation. ↩

[11] Kementerian ESDM jajaki produksi surfaktan EOR dengan Petrokimia Gresik dan IPB (Ditjen Migas). Ditjen Migas (Ministry of Energy), 13 Jul 2020. Full article (evidence reader). Ministry explores EOR surfactant production with Petrokimia Gresik and IPB.

[12] Optimizing surfactant polymer flooding (Alli et al., IATMI 2022 proceedings, publ. 30 May 2023). IATMI symposium proceedings, 2022 symposium, published 30 May 2023. Abstract only. Polymer costed at USD 3.3/kg; SP chemicals USD 4.52 per incremental barrel. A study input, not a purchase price. ↩

[13] Polymer Flooding (IntechOpen chapter). IntechOpen, book chapter. Section on economics (evidence reader). Polymer cost USD 1–4 per incremental barrel in reported floods. ↩

[14] Permen ESDM on domestic products in upstream oil and gas (Ditjen Migas, 8 Mar 2013). Ditjen Migas (Ministry of Energy), 8 Mar 2013. Section. Ministerial regulation on domestic products in upstream oil and gas: price preference for goods with TKDN of at least 25%. Later rules may change the percentages. ↩

[15] Acrylamide price trend and forecast 2026-2027 (Expert Market Research, updated 8 Sep 2026). Expert Market Research, updated 8 Sep 2026. Free price figures only. Acrylamide in China USD 1.01/kg in Q1 2026; 2026 forecast USD 1.00–1.20/kg. A market-research seller; no independent confirmation found. ↩

[16] Polyacrylamide plant design paper (Jurnal Teknik Kimia ULM). Jurnal Teknik Kimia, Universitas Lambung Mangkurat, undated. Search snippet only; the PDF returned an error. States that no polyacrylamide plant exists in Indonesia. ↩

[17] Elnusa sukses terapkan CEOR offshore pertama (Investortrust, 15 Jul 2026). Investortrust, 15 Jul 2026. Full article (evidence reader). Elnusa supplies polymer material and injection units at Rama offshore. ↩

Competitors and substitutes

Who Offering Price Channel and position Source
SNF (France); PT SNF Polymers Indonesia EOR-grade polyacrylamide made abroad; activity of the Indonesian entity unknown Not found Exclusive through Elnusa Petrofin 2023–2026; qualified at Minas [3][4]
Elnusa Petrofin (Pertamina subsidiary) Polymer material, injection units and operation Not found Group supplier; one point of service [3][17]
A Pertamina-group plant Group-built polymer production, as done for surfactant n/a Internal; proven route for surfactant via Pertamina Lubricants [7]
Daqing Oilfield (China) Chemical EOR partner for Areas C, E and F Not found Group cooperation [2][10]
Unnamed domestic source Implied by the Dec 2025 “fully domestic” statement Unknown Unknown [5]
PT Luas Birus Utama Oilfield chemicals, 50,000 t/yr capacity Not found Tenders; 2023 Rokan finalist [9]

Evidence ledger

  • Observed: polymer reported imported in June 2026 [2]; SNF exclusive through Elnusa 2023–2026 [3]; surfactant localised through a group company [7]; Areas B and D in preparation [2]; 505 mmstb Minas-D polymer potential [8]; TKDN price preference at 25% [14].
  • Contradicted: the Dec 2025 statement that all chemical-flood components are domestic [5]. We weight the later, specific June 2026 statement [2].
  • Inferred: that pilot-sized volumes explain the import arrangement; that a Riau-made polymer would score 40–50% TKDN (the official counting method may give a different figure).
  • Missing: what PHR pays for delivered polymer; who supplies it after 2026; whether SNF’s Indonesian entity makes polymer; the Area B and D schedule.

Economics workings

Plant cost per kilo of polymer delivered to Minas, at about 80% utilisation:

Item Calculation Status
Acrylamide USD 1.00–1.20/kg × 1.05 kg = USD 1.05–1.26/kg Sourced [15]
Monomer import freight and duty USD 0.10–0.20/kg Assumption
Polymerisation, drying and grinding energy USD 0.25–0.45/kg Assumption
Operators and quality checks USD 0.10–0.20/kg Assumption
Equipment depreciation USD 0.30–0.60/kg Assumption
Truck to Minas USD 0.05–0.10/kg Assumption
Total USD 1.85–2.81/kg (central ≈ USD 2.3/kg) Estimate
At 40% utilisation equipment USD 0.60–1.20/kg; total ≈ USD 2.15–3.41/kg Estimate
Comparison price USD 3.3/kg Study input [12], not a purchase price

Contribution at a target price of USD 2.6–3.0/kg (assumption): about USD 0.3–0.8/kg in the central case. Weakest input: utilisation, then the unpublished delivered price.

First market (Rokan polymer floods, 2029–2031):

Step Calculation Status
Base 505 mmstb Minas-D Stage-1 polymer potential Sourced [8]
Annual at plateau 505 mmstb ÷ 20 years ≈ 25 mmbbl/yr Assumption (20 years)
Reached by 2029–2031 25 mmbbl/yr × 30–60% = 7.6–15.2 mmbbl/yr Assumption, given the 2029–2030 target [2] and past slippage
Polymer per barrel USD 1–4/bbl [13] ÷ USD 3.3/kg [12] ≈ 0.3–1.2 kg/bbl Derived
Tonnes 7.6–15.2 mmbbl × 0.3–1.2 kg ≈ 2,300–18,200 t/yr Estimate
Value × USD 3.3/kg × Rp 16,500/USD ≈ Rp 124–994 bn/yr Estimate (exchange rate assumed)
Newcomer’s share × 20–35% ≈ Rp 25–350 bn/yr (central ≈ Rp 90 bn ≈ 1,700 t) Assumption
Bottom-up cross-check 5 operators [8] × 1 award/yr × Rp 25–250 bn = Rp 125 bn–1.25 tn/yr Count sourced; frequency and value assumed; not independent of the top-down figure

Wider market, for context: TAM ≈ Rp 1.23–4.92 tn/yr (745.6 mmstb chemical-EOR potential [8] ÷ 20 years × USD 2–8 chemical cost per barrel [12][13] × Rp 16,500/USD); SAM ≈ Rp 0.43–2.46 tn/yr (polymer’s 35–50% share, assumed); year-5 revenue ≈ Rp 21.5–246 bn/yr (5–10% of SAM, assumed).

How the business would work

The Domestic EOR polymer plant for Rokan’s next floods needs a licensed polymerisation process (from a maker other than SNF, or a joint venture), a forward contract for acrylamide, a line of a few thousand tonnes a year, a quality laboratory, a TKDN certificate and a test programme with PHR in which its grade is compared with SNF’s in core samples (a laboratory test on rock from the field), for example at LEMIGAS, the state oil and gas research centre. It would start with small spot lots during testing, then a fixed-price term contract once a pattern is injecting, and grow into other Pertamina-group floods (Zulu 29.1 mmstb and Tanjung 53.1 mmstb on the 2024 list [8]) and water-treatment and mining grades.

Routes considered

Folded into the Domestic EOR polymer plant for Rokan’s next floods: a powder grade made to dissolve quickly in the injection units; a forward contract on acrylamide to fix the main cost; selling polymer separately from the injection service; spot lots during testing followed by a term contract; qualifying one new area at a time; and several grades for different areas.

  • Paying the supplier according to extra oil: the extra oil cannot be credited to the polymer alone, so PHR would not accept it and the supplier would carry risks it cannot control.
  • An independent laboratory to test polymers: PHR and state laboratories already do this work, and there are few buyers.
  • Renting an existing Indonesian line to make polymer under contract: no such line was found [16].
  • A local palm-based surfactant supplier: PHR already owns its surfactant formula and has it blended by a group company [7], and the ministry has explored surfactant production with Petrokimia Gresik and IPB [11].
  • Liquid polymer concentrate instead of powder: it ships mostly water over long distances, and nothing shows dissolving powder is a problem at Minas.
  • A dosing and injection service: Elnusa already provides injection units and operation [17].
  • Elnusa itself building a plant: that is the incumbent’s likely response, not a new company.

Open questions

  • Who makes the polymer injected in Minas Area A, where, and at what delivered price? (PHR, SKK Migas, Elnusa)
  • Will the Area B and D polymer be tendered openly after the 2023–2026 exclusive? (PHR procurement)
  • Does PT SNF Polymers Indonesia polymerise in Indonesia? (business licence records, SNF)
  • When will Areas B and D inject at scale? (SKK Migas work programme approvals)

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *